Skip to content
Home / BOILER / MECHANICAL ROOM / Boiler Room-Mechanical Room Unit / University of Toronto- Roof Top Lab
University of Toronto- Roof Top Lab
Prefabricated Mechanical Room and Test Lab Complete with all Mechanical, Electrical and Control Equipment Installed, Piped and Wired.
Fully Thermally Broken 8″ Walls, Roof and Floors with Insulation Value of R50, Removable Panels, Four Separate Rooms.
Designed and Built to Pass 14″ w.c. Pressure Test with Less than % 0.5 Leakage.
U of T Students will be able to Simulate and Test all Possible Real Life Climatic Conditions in a Condo Environment.
Engineers: Morrison Hershfield
Prefabricated Mechanical Room and Test Lab Complete with all Mechanical, Electrical and Control Equipment Installed, Piped and Wired.
Fully Thermally Broken 8″ Walls, Roof and Floors with Insulation Value of R50, Removable Panels, Four Separate Rooms.
Designed and Built to Pass 14″ w.c. Pressure Test with Less than % 0.5 Leakage.
U of T Students will be able to Simulate and Test all Possible Real Life Climatic Conditions in a Condo Environment.
Engineers: Morrison Hershfield
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it. Ok Read More